| Contents |
Available as:
|
| 1.
Introduction |
 |

|
| 1.1 Background
to the Project. |
| 1.2 Overview
of the main conservation issues being addressed |
| 1.3 Summary
of the project's objectives and expected results |
| 2. Overall
project summary |
 |
 |
|
2.1 Actions undertaken
|
|
2.2 Overall assessment
|
|
2.3 Future
|
| 3. Detailed
report of activities |
|
|
| 3.1 Preparatory
actions and management plans |
|
 |
| 3.2 Non-recurring
biotope management |
|
 |
3.2.1 Monadh
Mor
|
|
 |
3.2.2 Inshriach
|
|
 |
3.2.3 Mondhuie
|
|
 |
3.2.4 North
Abernethy
|
|
 |
3.2.5 Dell
Wood
|
|
 |
3.2.6 Garten
Wood
|
|
 |
3.2.7 Pitmaduthy
|
|
 |
3.2.8 Conon
|
|
 |
3.2.9 Lower
Spey Bay
|
|
 |
3.2.10 Management
of Brash
|
|
 |
| 3.3 Public
awareness and dissemination of results |
|
 |
3.3.1 Monadh
Mor
|
3.3.2 Inshriach
|
3.3.3 Abernethy
(all sites including Mondhuie, Garten
Wood, Dell Wood and North Abernethy)
|
3.3.4 Pitmaduthy
|
3.3.5 Conon
|
3.3.6 Lower
Spey Bay
|
3.3.7 General
|
3.3.8 Conference
|
3.3.9 Wet Woods Web Site
|
3.3.10 Overview
|
| 3.4 Research |
|
 |
3.4.1 Hydrological
and historical survey of Project bog woodland
sites
|
3.4.2 Costed
options for Pitmaduthy Moss
|
3.4.3
Monadh Mor: Impact of bog woodland restoration
on adjacent land surrounding the Newlands
of Ferrintosh
|
3.4.4 Impact
of bog woodland restoration on adjacent
land surrounding Mondhuie
|
3.4.5 Classification
of bog woodland habitat and review and
analysis of restoration management at
the RSPB Abernethy Forest Reserve
|
3.4.6 A
survey of the peat stratigraphy of seven
bog woodland sites in Scotland
|
3.4.7 Age structure of Scots pine woodland
|
3.4.8 Historical
survey of the River Conon
|
3.4.9 The
residual alder woodlands of the River
Conon
|
3.4.10 Research
overview
|
|
3.5 Monitoring
|
|
 |
| 4. Overall
project assessment |
 |
 |
4.1 Has
the project achieved its objectives? Successes
and failures
|
4.2 Conservation
benefits
|
4.3
Incentive/pump-priming effects and networking
|
4.4
Demonstration and benefits of EU funding
|
4.5
Socio-economic effects
|
4.6
The future: prolonging the effects of
the project/further action needed
|
|
5. List of identifiable products
|
|
 |
5.1 With second interim report October
2000
|
5.2 With third interim report December
2001
|
5.3 With final report October 2002
|
5.4 Photographs
|
|
Acknowledgements
|
 |
 |
|
Maps (not yet available
- to be added soon)
|
|
|
|
Annex A: Draft Bog Woodland Site
Condition Monitoring Methods
|
|
 |